PENCO-TELECOM


             32Years in the Telephony Industry  as well as a second generation


 

 


linkedinFACEBOOK TWITTERINSTAGRAM


    Helpful Videos On The Road War Room Home Blog


Field Install

DC POWER:

BROADBAND CO.

 


Cell Site Power Bay Swap Outs

BEFORE

pictures/PRE_ALARMS_G.JPG  pictures/PRE_PLANT_AND_CABLES_F.JPG  pictures/PRE_EXISTING_PLANT_B.JPG 

                                                                   AFTER                                                                   

POST 24V SHELF_K.JPG  POST 48V SHELF LABEL_P.JPG    POST INSIDE PLANT_J.JPG  POST AC PANEL_X.JPG  POST AC PANEL LABELED_Y.JPG 


METRO 2     I    INSTALLS

 

 

   

 

 

 

   


RESEARCH TRIANGLE PARK

    

 

HEAD END INSTALLES


 

a picture of cp 7600 shelve  A PICTURE OF SOME CABLES   Picture of a F-connector

Picture of cables ran  Picture of cablerack installed  Picture of battires installed  Picture of batteries iinstalled  Picture of  Fiber duct

Cables form on back of headend equipment 

Valid CSS!

HOME